Shutdown Work Planning

Non-Routine Project Planning

Shutdown: Aug - Sept 2017
Description Division Approval Design Review Resource Plan Readiness Review
Install Isolation window in Linac - - -
Replace Low Temperature Heating Water pipe between Bldg. 400 and 450. - - -
Installation of L1:AS1 with new strong back - - -
P-3673: Increase Cant Angle at 4-ID - - -
Install MBABPM at 25-ID - - - -
P-3153 -XTIP 4-ID Beamline - - -
P-3422: Replacement of SR RAW Supply PLC - - -