Advanced Photon Source

An Office of Science National User Facility

Resource Page

Resource Page
Title Author Reviewer Review Period Date
RSS Operations Procedures
Policy on Design, Installation, and Maintenance of Radiation Shielding Systems G. Pile

APS Director
AES/XSD/ASD DD's

Annual 04/06/17
Configuration Control Work Permit Procedure G. Markovich G. Markovich Annual 03/31/17
Posting a Beamline or Front-End Configuration Control Work Permit and UES Type C Survey Information Form P. Pedergnana PSC-EFOG
AES-SI
HP-ESQ
Annual 02/22/17
Configuration Control Work Permit Procedure for Opening and Closing Labyrinths P. Pedergnana P. Pedergnana Every 2 Years 01/04/16
Configuration Control Work Permit Procedure for Opening and Closing Mini-Hutches P. Pedergnana P. Pedergnana Every 2 Years 01/04/16
CCWP Alternate Approval Workflow Request Memo G. Markovich AES-DD Memo 10/06/09
Master 1 for 1 Component Replacement Procedure for Personnel Safety Systems (PSS) G. Markovich CCSM
AES-ADD-DD
Annual 09/25/16
APS Enable Removal - Configuration Control Work Permit P. Pedergnana P. Pedergnana Every 2 Years 09/14/15
APS Enable Removal at the End of User Operations and Reinstating Enable at the Start of User Operations P. Pedergnana P. Pedergnana Every 2 Years 10/11/16
Beamline Pre-Run Procedure P. Pedergnana N. Moonier Every 2 Years 12/15/15
Procedure for Performing the Planning and Execution of Shielding Verification Process W. VanWingeren AES-ADD
AES-CCSM
PSC-EFOG
RSO-HP
Annual 09/30/16
Procedure to Have Welding Performed on Experimental Enclosures W. VanWingeren W. VanWingeren Annual 09/30/16
Experiment Enclosure Routine Radiation Surveys J. Vacca AES-DD Annual 02/02/17
Safety Procedures
Posting Experiment Authorization Forms / Experiment Hazard Control Plans B. Glagola N. Moonier Every 2 Years 12/15/15
Locking an Experiment Station Containing Hazardous Materials P. Pedergnana B. Glagola Every 2 Years 12/15/15
Locking an Experiment Station Under An Administrative Restriction B. Glagola PSC-EFOG
AES-ADD-MIS
Every 2 Years 02/29/16
R. Janik A. Stevens Annual 08/22/16

Procedure for Performing Circuit Lockout/Tagout of 110/208V Technical Panels

LOTO Checklist

C. White E. Chang Annual 02/28/17
Response Process for Oxygen Deficiency Hazard Alarms B. Glagola AES/XSD ESH Coordinators Annual 09/06/16
Procedure for the Management of Broken Beryllium Windows and Equipment Contaminated with Beryllium Oxide

B. Glagola
P. Rossi
E. Chang

T. Barkalow
J. Davis

Annual 09/07/16
Floor Operations
Procedure for the Use of Beamline Global Online Keys P. Pedergnana EFOG/ MCR/ SI Annual 04/28/17
Procedure for Administrative Restriction Forms on APS Beamlines W. VanWingeren AES-ADD
PSC-EFOG
Every 2 Years 12/15/15
Posting Shutter Authorization Forms P. Pedergnana B. Glagola Every 2 Years 02/03/2016
Personnel Safety Systems (PSS) Minor Fault Reset Procedure P. Pedergnana B. Glagola
G. Markovich
Every 2 Years 01/08/16
Front-End Equipment Protection System (FE-EPS) Reset Procedure P. Pedergnana

PSC-EFOG

AES-MOM

Every 2 Years 02/10/17

Instruction for APS Beamline Front-End Exit Valve and Beamline Isolation Valve Operation

Work Planning and Control Worksheet

J. Zientek J. Zientek Annual 02/03/17
Liquid Nitrogen Automatic Fill Station Operating Instructions A. Stevens FMS Building Maintenance Every 3 Years 2/28/17
Liquid Nitrogen Fill Station Emergency Procedure A. Stevens FMS Building Maintenance    
Liquid Nitrogen Distribution System Alarm Response A. Stevens FMS Building Maintenance Annual Under Review
Beamline Specific Procedures        
1-BM Mode Change Procedure P. Pedergnana AES-SI
XSD-ADD
Every 2 Years 05/03/17
1-ID Mode Change Procedure P. Pedergnana AES-SI
XSD-ADD
Every 2 Years 05/18/17
4-ID-C End-Station Connection and Removal Procedures including Window Replacement J. Freeland XSD-ADD-DD
PSC-ADD-DD
Every 2 Years Under Review
7-ID-C/D Laser Transport Configuration B. Fieramosca
D. Walko
XSD-TRR-S7
PSC-EFOG
XSD-AES-ESH
Every 3 Years 08/20/15
7-ID Mode Change Procedure P. Pedergnana AES-SI
XSD-ADD
Every 2 Years 05/03/17

29-ID UHV Transport and Beam Stop Reconfiguration

Approved Final Beam Stops and Chambers

J. McChesney XSD-MM GL
XSD-ADD
PSC-EFOG GL
Every 2 Years 10/21/15
32-ID Mode Change Procedure P. Pedergnana SI-GL
AES-ADM
Annual 11/01/16
Locking the 433/434 Truck Lock Door P. Pedergnana PSC-EFOG GL
PSC-EFOG
Annual 11/03/16
Instructions/Guidelines

RSS Component Classification

Instructions for Making RSS Tags

RSS tag template

P. Pedergnana

W. VanWingeren

W. VanWingeren

PSC-EFOG    
Blind Penetration, LMS-PROC-152 ANL - Labwide     Effective 09/11/2014